New Location Deployment Checklist

31 steps from site assessment to go-live. Use this to ensure nothing gets missed when deploying connectivity to a new location.

Timeline
2-3 weeks
Steps
31
Topic
Infrastructure as a Service

New location deployments fail when steps get skipped. The site survey that didn't happen. The carrier coverage that wasn't tested. The firewall rules that weren't configured until day one.

This checklist covers six phases. Complete each phase before moving to the next.

Phase 1

Site Assessment

Understand the physical environment before selecting hardware or carriers.

Phase 2

Carrier Selection

Test actual coverage — don't trust coverage maps alone.

Phase 3

Hardware Selection

Match equipment to site requirements — not the other way around.

Related Resource

SD-WAN for Multi-Location Operations

Complete guide with ROI calculator. How SD-WAN transforms multi-site connectivity and when LTE/5G integration makes sense.

Read the guide →

Phase 4

Configuration

Configure everything before shipping to site — not during installation.

Phase 5

Installation

Execute the physical deployment.

Phase 6

Go-Live

Verify everything works with real traffic.

Typical timeline

Standard Location with Good Coverage

3-5 days

Site Assessment + Carrier Selection

5-10 days

Hardware Ordering

3-5 days

Config + Staging + Install + Go-Live