31 steps from site assessment to go-live. Use this to ensure nothing gets missed when deploying connectivity to a new location.
Timeline
2-3 weeks
Steps
31
Topic
Infrastructure as a Service
New location deployments fail when steps get skipped. The site survey that didn't happen. The carrier coverage that wasn't tested. The firewall rules that weren't configured until day one.
This checklist covers six phases. Complete each phase before moving to the next.
Phase 1
Site Assessment
Understand the physical environment before selecting hardware or carriers.
Phase 2
Carrier Selection
Test actual coverage — don't trust coverage maps alone.
Phase 3
Hardware Selection
Match equipment to site requirements — not the other way around.
Related Resource
SD-WAN for Multi-Location Operations
Complete guide with ROI calculator. How SD-WAN transforms multi-site connectivity and when LTE/5G integration makes sense.
We deploy connectivity for 10-200+ location rollouts. Same checklist, but we handle every step — site surveys, carrier selection, hardware staging, installation coordination, and go-live support.